Why do some Project Risk fields seem out of order or irrelevant?

Last updated: July 11, 2025

If you're seeing fields like Embankment, Geographic Regions, or Profit Potentials in your Project Risk Configuration and wondering what they mean (or why they’re even there!), here’s what’s up:

👉 Embankment

This field is specific to Heavy Highway implementations. It won’t apply to General Contractor or Subcontractor-type setups. If you’re seeing it but it’s not relevant to your workflow, don’t worry—it’s just part of the broader risk template available in settings.

👉 Geographic Regions

This field is used for grouping and sorting—not for active risk calculation (at least for now). Currently, it reflects the state projects are in, and isn’t tied to a numerical risk rating.

👉 Profit Potentials

The “Profit Potential” field reflects calculation values used in the backend. These decimals aren’t meant to be manually adjusted—they’re tied to how potential risk is calculated.

TL;DR: Not every field is meant for every use case. If you're seeing something unfamiliar, it’s likely tied to a different implementation type.